Double doors lead to:
The kitchen!
Needs a lot doing to it, like everything - but it's all cabled for electric and piped up for water - so the hard work is done, (she said glibly!)
Back into the entrance hall and we have the bathroom, not that it will have a bath!
There are 3 bedrooms which are currently just bare rooms, no light fittings, just 4 white walls and tiled floors!
The hot tub will go here, on this part of the front terrace with views right down the valley.
The garage will be turned into a utility room
with the central heating boiler, washing machine and second freezer (emergency supplies incase we are snowed in during winter - I kid you not! We've even been practicing freezing milk, which works fine!) I'll also have an indoor drying area for when the odd rainy day makes drying the towels difficult.
No comments:
Post a Comment